These images are from the TAC building which is currently being constructed in the Geelong CBD on Brougham Street. The TAC building in the images above show precast panel concrete structure being assembled, the crane hoisting the panels in to position. In the background of the bottom photo, you can also see the concrete pump which is pumping the concrete onto the higher levels.
Sunday, June 1, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Great job, I especially like the shot of all the reinforcements sticking out the side of the building.
Post a Comment